Aluminum panel manufacturer: Introducing aluminum panel construction methods
Apr 08,2021
1. Construction methods for aluminum panels
Beforealuminum panelsthe construction, the construction personnel must first have a detailed understanding of the construction methods, so that they can clearly know what machinery and tools are needed during the construction process.aluminum panelsConstruction tools can be divided into the following three aspects:
1. Workbenches, cutting machines, forming machines, crimping tools, and grinding machines required for cutting, processing, and assembling metal panels.
2. Portable electric drills connected to metal panels, concrete wall drilling drills, steel rulers (1m long), long tape measures, box rulers, hammers,
3. Various shapes of round (flat) steel chisels, wires, powder line packs for elastic lines, chalk lines, small white lines, portable grinders, pliers, iron levels, cotton lines, brooms, shovels, knives, ash troughs, ash buckets, tool bags, gloves, red pencils, etc.
2. Construction plan for aluminum panel walls
The construction plan for the wallsaluminum panelsclearly includes operational conditions, but many construction personnel are still unclear, which can lead to quality issues in the project. In fact, the construction operating conditions can be divided into five aspects:
1. The ceiling has been plastered, and the moisture content after drying does not exceed 8%; wooden products should not exceed 12%.
2. Reserved embedded parts for water, electricity, and equipment, as well as roof walls. Machines and tools for vertical transportation should be prepared in advance.
3. Pre-check the basic level of the decorative panel project and record the hidden pre-check records, and only proceed with the installation process after passing the test.
4. The external scaffolding (high-rise multifunctional hanging baskets or brackets) should be set up and installed in advance. Multi-story buildings should use double-row scaffolding or bridges, and their horizontal and vertical rods and cross braces should maintain a distance of 150-200mm from the walls and door/window corners. The height and support of the scaffolding must meet structural requirements and safety operation regulations.
5. When providing technical clarifications to construction personnel, emphasis should be placed on technical measures, quality requirements, and protection of finished products. A model house should be established before large-scale construction, and team building can only be organized after the quality inspection department passes the assessment.